Marking the Anchor Rodes

It's useful, if not essential, to know how much anchor rode you have out at any time.  This means that the rode must be marked.  Most people buy those little plastic strips from the marine store and install them through the strands of their anchor line--I've used them myself.  The problem with these is that they tend to rip off and fail in a short time.  A better solution is called for.

In Cost Conscious Cruiser, by Lin & Larry Pardey, I read about their own solutions to marking the anchor rode.  They have a good solution for both all chain and nylon rodes.  My rodes are mostly nylon, so I thought I'd try their marking solution.  I modified the idea slightly for reasons that I'll discuss below.

Their idea is to use some strong thread--they used a polyester twine used for mending fishing nets--and create tight whippings around the line in a predictable, and easy to remember, pattern to instantly identify how much line is out.  The whippings, being small and tight, hold up well, even when a windlass is used.  We don't have windlass at this time, but the idea still made sense.  Because all of their rodes are the same length, they created a system where the number of markings increase up to the center of the rode, and then decrease again as it continues--allowing the rode to be end-for-ended to spread wear, and the marking system would remain the same.

We have several different-length rodes, so I couldn't come up with a system to keep the markings consistent from end to end on all of them.  Therefore, I decided to just keep increasing the number of whippings for each marking as I went along--this means that there will end up being a lot of marks at some lengths, but the only downside to this is the time needed to create all the whippings.  I started the job in February, when the Olympics were on TV.  It's pretty mindless work, so this was the perfect time to do it.  I sat on the couch in the living room and did my little sewing project--it was even kind of fun!  It doesn't really take that long, once you  get used to it..  To prevent the number of marks from getting too ridiculous I decided to use a single wrap of a second color (red) to signify (and replace) five blue markings.  This means that I can essentially start over every four marks.  See the chart below to see how this works.

Like the Pardeys, I decided to mark the rodes every 30' of length.  The marking system is below:

  • 30 feet:   One blue mark

  • 60 feet:   Two blue marks

  • 90 feet:   Three blue marks

  • 120 feet:  Four  blue marks

  • 150 feet:  One red mark

  • 180 feet:  One red mark and one blue mark

  • 210 feet:  One red mark and two blue marks

  • 240 feet:  One red mark and three blue marks

  • 270 feet:  One red mark and four blue marks

  • 300 feet:  Two red marks

  • 330 feet:  Two red marks and one blue mark

  • And so on....(if required)

So, on any given rode, all you need to do to determine how much is out is multiply the number of marks by 30--easy to do.  An added advantage is that the markings are apparent just by feel, so they can be detected in the dark even without a light if need be.  

I bought a spool of red and a spool of bright blue polyester cording called heading twine. (Hamilton Marine or other fishing supply house)  It's very strong, and the bright color forms an excellent contrast with the white rope.  This material is perhaps a little thick, but it doesn't matter.  I debated using a thinner material they had at the store (black), but decided I liked the bright color of the heading twine.  They had several colors in stock.

To make each mark, I cut a length of the heading twine and began by tying it to one strand of the anchor rode (3-strand nylon).  It's easy to separate the twist of the line for this.  I pulled the simple knot tight, and then wrapped the line tightly around the rode until I had about 3/4" covered.  Then, I completed the wrapping by tying the twine to itself and again through the strands of the rode.  To help seal the knots, I used my small torch to slightly melt the ends and make the knots permanent.  I repeated this process for each whipping, spacing them about 1-1/2" or so apart.  The line is marked every 30 feet.

This would probably be enough, but I went a step further and whipped the marks with some regular white waxed sail thread.  I used a large needle to push the thread through the strands of the rode, following the twist of the line, and pulling it tight.  This should really secure the marks in place.  The heading twine was too thick for this purpose--that would be one advantage of using the thinner black nylon stuff I had considered.  After tying off the thread, I melted the knots with my torch and also give the whole whipping a slight bit of heat to sort of seal the thread and twine together.

I found that the polyester twins is very hard on the hands when pulling it tight.  But, in one night--not working the whole time by any stretch--I marked one of my rodes up to 150' of length.  That's a total of 15 whippings.  You can click the picture, left, for a larger view. 

 

 

 

 

 

At the last marking on each line--usually about 30 feet or so from the bitter end--I made some unmistakable marks on the line so that it would be obvious that the end of the line was very near.  To do this, I wrapped about 3-4" of the line with red twine, and a further 3-4" with the blue twine.  This creates a mark that is extremely easy to see and will not be mistaken for anything else.  When this mark comes up through the deck pipe, it's time to cleat off that anchor rode for good.   Then, I added a traditional whipping to the very end of the line using the white waxed sail thread, just to supplement the melted end as was supplied by the manufacturer.

 

Anchor Rode Storage--Fore and Aft

The Triton is blessed with a huge chain locker forward of the vee berth.  There's plenty of room here for two substantial rodes.  Because I installed two anchors at the bow--two anchors that I want to both be ready to drop at any time--I needed to partition the chain locker so that the two rodes would stay separate from each other.  The photo shows the chain locker before beginning the divider project--huge and wide open.

To create the simple divider, I took a few measurements of the space in the locker and cut a piece of 3/4"plywood to fit.  It doesn't have to be perfect--it's hidden and is only a rope divider.  Once I was satisfied with the way my piece was fitting, I coated the entire thing in unthickened epoxy resin to seal it.  When the epoxy cured, I scrubbed off the amine blush with water and a Scotch-Brite pad, and sanded it to give it tooth for future paint.

 

 

 

With a warm day in February, I decided to go ahead and install the divider in place.  I mixed up some thick epoxy (using 406 colloidal silica).  I spread a heavy bead of epoxy along the bottom edge of the locker (in the crease) and on the bottom, vertical edge of the stem reinforcement.  I also applied some to the forward side of the chainlocker bulkhead where the divider would touch.  Then, I pressed the divider into this goop, and spread any remaining around to fill gaps and create a small fillet.  I left it to cure.  The new divider will eventually be painted to match.

 

 

A related project is the covering and finishing of the forward chain locker bulkhead.  Please click here to view that project.

CQR RODE:  It may not be the most elegant solution, but I ran the anchor rode for the CQR anchor through the existing bronze ventilator on the foredeck.  Perhaps I'll install a proper chain pipe someday, but this works for the moment.  For stormy conditions, there are a couple options to seal off this ventilator: stuff it with clay (or silly putty!); spray in some canned foam; or install a canvas cover over the entire thing.  Most of the time, for the type of sailing we do so far, we can leave the ventilator open without a problem.

CLAW RODE:  For the second anchor, I installed a bronze chain pipe made by ABI.  It features a removable cover (with slots for chain and rode) and a large opening (3-1/2") to allow the rode and chain to easily pass through.  None of this stuffing a line through a tiny hole, an exercise in maximum frustration.  Also, I didn't want one of those oval chromed ones that are so common.

The first thing I did after getting the new chain pipe was to spray a number of coats of clear lacquer over the entire thing to prevent it from tarnishing.  I found that this worked well for my exterior bronze last season, although the cold during the winter seemed to cause the lacquer to shrink and peel off.  I'll deal with this later.

I installed the chain pipe on the foredeck to allow the second anchor rode to be passed into the chain locker beneath.  Please click here to read how. 

STERN ANCHOR RODE:  For the stern anchor, I think I'll install another one of those round deck pipes in the poop deck, and create a storage area for the line in there.  This project is complete  Click here.

 


Glissando, Pearson  Triton #381
www.triton381.com 

We recommend viewing this site with your screen resolution set to 1024 x 768 or larger.  Problems?  Email the webmaster.

©1999-2014 by Timothy C. Lackey.  All rights reserved.  No duplication of any portion of this website allowed without express permission.  Permission may be obtained by emailing the webmaster.